Morena 1 SEZ Transmission Limited (M1STL)
Enerica Infra 1 Private Limited (a wholly-owned subsidiary of EnerGrid) acquired 100% of Morena I SEZ Transmission Limited (M1STL) from PFC Consulting Limited on 3 February 2026, after being selected to build the Inter-State Transmission System evacuating power from RE projects in Madhya Pradesh's Morena SEZ — Phase I (2,500 MW) — on a Build, Own, Operate & Transfer (BOOT) basis via TBCB.
The scheme adds a new high-capacity pooling substation, extra-high-voltage transmission lines and bay augmentation works, strengthening central India's grid and evacuating 2,500 MW of renewable capacity from one of the country's emerging clean energy hubs. It is EnerGrid's first transmission asset.
| Project Element | Route Length (Ckms) | Substation Capacity (MVA) | Specifications | Commission Status | Expiry / Term of TSA |
|---|---|---|---|---|---|
| Morena PS–Karera Line | 170.5 | — | 765 kV D/C | Under Construction | 35 years from COD |
| 765/400 kV Morena Substation | — | 5,500 | 765/400 kV | Under Construction | 35 years from COD |
| Line Bays at Karera (for Morena PS–Karera Line termination) | — | — | 2×765 kV Line Bays | Under Construction | 35 years from COD |
Quick facts: RE evacuation capacity 2,500 MW · Madhya Pradesh · ~170.5 ckm · ~5,500 MVA · BOOT · Inter-State Transmission System (ISTS).